Central London Office Refurbishment

  • Home
  • Central London Office Refurbishment

Central London Office Refurbishment

Brief:

Office conversion from CAT A to Cat B fit out.

Solution:

The project consisted of a (5000 sq ft) fit out over two floors.

These works were completed over six weeks and the clients was delighted with the finished works.

Works Consisted of:

Newly created meeting rooms on both floor/ Complete strip out of the toilet and shower areas./ New Kitchen and break out on both floors.

Fully re-wired for power, lighting and new data points/ Strip out of the existing mechanical and plumbing systems to allow for upgrade.