Central London Office Refurbishment
Brief:
Office conversion from CAT A to Cat B fit out.
Solution:
The project consisted of a (5000 sq ft) fit out over two floors.
These works were completed over six weeks and the clients was delighted with the finished works.
Works Consisted of:
Newly created meeting rooms on both floor/ Complete strip out of the toilet and shower areas./ New Kitchen and break out on both floors.
Fully re-wired for power, lighting and new data points/ Strip out of the existing mechanical and plumbing systems to allow for upgrade.